During the operation of the Air Preheater (APH), the heat transfer efficiency may degrade over time due to mechanical factors and operating conditions, leading to increased air leakage rates. Therefore, periodic efficiency checks of the overall system are necessary to extend system lifespan and optimize operation.
With specialized equipment capable of meeting the requirements of most plants, Chugai Technos conducted APH performance test for Mong Duong 2 Thermal Power Plant in Vietnam.
If you need to confirm the performance of the APH system, please call the Hotline at 0909-714-566 or leave your information HERE for Chugai Technos to promptly contact you to answer inquiries and provide support.